User Tools

Site Tools


contact

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
contact [2025/05/18 16:50] 125.166.99.1contact [2025/05/18 16:54] (current) 125.166.99.1
Line 2: Line 2:
  
 ✅ 1. Define Raw Materials ✅ 1. Define Raw Materials
 +
 These are the lowest-level components (foam, fabric, zippers, etc.) These are the lowest-level components (foam, fabric, zippers, etc.)
  
Line 22: Line 23:
    
 ✅ 2. Define Sub-Assemblies (Components) ✅ 2. Define Sub-Assemblies (Components)
 +
 These are assembled from raw materials: These are assembled from raw materials:
   * Mattress Cushion   * Mattress Cushion
Line 31: Line 33:
    
 ✅ 3. Define the Finished Good ✅ 3. Define the Finished Good
 +
 Create: Create:
 • Madrid Sofa • Madrid Sofa
Line 42: Line 45:
  
 Go to MRP > Bill of Materials Go to MRP > Bill of Materials
 +
 Click New bill of materials for each manufacturable item. Click New bill of materials for each manufacturable item.
 +
 📌 A. BOM for "Mattress Cushion" 📌 A. BOM for "Mattress Cushion"
-Component Quantity Note + 
-HR Foam 40D – Seat 2 pcs  +  * Component Quantity Note 
-Fabric – Outdoor 3 m  +  HR Foam 40D – Seat 2 pcs  
-Polyester Thread 50 m  +  Fabric – Outdoor 3 m  
-Zipper YKK 60cm 2 pcs  +  Polyester Thread 50 m  
-Loss (built-in) Add 5–10% to quantities if needed manually +  Zipper YKK 60cm 2 pcs  
 +  Loss (built-in) Add 5–10% to quantities if needed manually  
 📌 B. BOM for "Back Cushion" 📌 B. BOM for "Back Cushion"
 +
 Same style – just list relevant raw materials. Same style – just list relevant raw materials.
 +
 📌 C. BOM for "Rain Cover" 📌 C. BOM for "Rain Cover"
-Component Quantity + 
-Plastic Bag 1 pcs +  * Component Quantity 
-Velcro Tape 2 m +  Plastic Bag 1 pcs 
-Thread 10 m+  Velcro Tape 2 m 
 +  Thread 10 m 
 📌 D. BOM for "Madrid Sofa" 📌 D. BOM for "Madrid Sofa"
-Sub-assembly Quantity + 
-Mattress Cushion 1 +  * Sub-assembly Quantity 
-Back Cushion 1 +  Mattress Cushion 1 
-Pillow 2 +  Back Cushion 1 
-Rain Cover 1 +  Pillow 2 
-✅ Tip: If you need multi-level BOMs, Dolibarr can handle it by creating a BOM for each component, and using them inside the top-level BOM.+  Rain Cover 1 
 +  *  
 +✅ Tip: If you need multi-level BOMs, Cushion can handle it by creating a BOM for each component, and using them inside the top-level BOM.
    
-✅ 6. (Optional) Add Suppliers and Purchase Prices+✅ 5. (Optional) Add Suppliers and Purchase Prices 
 For each raw material: For each raw material:
-Go to Product > Suppliers +  * Go to Product > Suppliers 
-Add supplier reference, price, and conditions.+  Add supplier reference, price, and conditions.
    
-✅ 7. (Optional) Create Manufacturing Order+✅ 6. (Optional) Create Manufacturing Order 
 Once BOMs are in place, you can: Once BOMs are in place, you can:
-Go to Manufacturing > New Order +  * Go to Manufacturing > New Order 
-Select Madrid Sofa +  Select Madrid Sofa 
-It will calculate all subcomponents recursively +  It will calculate all subcomponents recursively 
-You can execute the production and deduct materials from stock+  You can execute the production and deduct materials from stock
    
 ✅ Summary ✅ Summary
 +
 You’ve now modeled: You’ve now modeled:
-Raw Materials → defined and stock-managed +  * Raw Materials → defined and stock-managed 
-Components → each has its own BOM +  Components → each has its own BOM 
-Finished Good → final BOM uses components +  Finished Good → final BOM uses components 
-Optional: Suppliers, stock, and purchasing details+  Optional: Suppliers, stock, and purchasing details
  
  
contact.1747561848.txt.gz · Last modified: by 125.166.99.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki