User Tools

Site Tools


contact

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
contact [2025/05/18 16:48] 125.166.99.1contact [2025/05/18 16:54] (current) 125.166.99.1
Line 23: Line 23:
    
 ✅ 2. Define Sub-Assemblies (Components) ✅ 2. Define Sub-Assemblies (Components)
 +
 These are assembled from raw materials: These are assembled from raw materials:
   * Mattress Cushion   * Mattress Cushion
Line 31: Line 32:
 Create each as a Product, nature = Manufacturable, and assign a BOM (see Step 5). Create each as a Product, nature = Manufacturable, and assign a BOM (see Step 5).
    
-✅ 4. Define the Finished Good+✅ 3. Define the Finished Good 
 Create: Create:
 • Madrid Sofa • Madrid Sofa
-o Type: Product +  * Type: Product 
-o Nature: Manufacturable +  Nature: Manufacturable 
-o Stock: Managed +  Stock: Managed 
-o Selling: Enabled (if you sell it directly) +  Selling: Enabled (if you sell it directly) 
-o Unit: pcs+  Unit: pcs
    
-✅ 5. Create BOMs+✅ 4. Create BOMs 
 Go to MRP > Bill of Materials Go to MRP > Bill of Materials
 +
 Click New bill of materials for each manufacturable item. Click New bill of materials for each manufacturable item.
 +
 📌 A. BOM for "Mattress Cushion" 📌 A. BOM for "Mattress Cushion"
-Component Quantity Note + 
-HR Foam 40D – Seat 2 pcs  +  * Component Quantity Note 
-Fabric – Outdoor 3 m  +  HR Foam 40D – Seat 2 pcs  
-Polyester Thread 50 m  +  Fabric – Outdoor 3 m  
-Zipper YKK 60cm 2 pcs  +  Polyester Thread 50 m  
-Loss (built-in) Add 5–10% to quantities if needed manually +  Zipper YKK 60cm 2 pcs  
 +  Loss (built-in) Add 5–10% to quantities if needed manually  
 📌 B. BOM for "Back Cushion" 📌 B. BOM for "Back Cushion"
 +
 Same style – just list relevant raw materials. Same style – just list relevant raw materials.
 +
 📌 C. BOM for "Rain Cover" 📌 C. BOM for "Rain Cover"
-Component Quantity + 
-Plastic Bag 1 pcs +  * Component Quantity 
-Velcro Tape 2 m +  Plastic Bag 1 pcs 
-Thread 10 m+  Velcro Tape 2 m 
 +  Thread 10 m 
 📌 D. BOM for "Madrid Sofa" 📌 D. BOM for "Madrid Sofa"
-Sub-assembly Quantity + 
-Mattress Cushion 1 +  * Sub-assembly Quantity 
-Back Cushion 1 +  Mattress Cushion 1 
-Pillow 2 +  Back Cushion 1 
-Rain Cover 1 +  Pillow 2 
-✅ Tip: If you need multi-level BOMs, Dolibarr can handle it by creating a BOM for each component, and using them inside the top-level BOM.+  Rain Cover 1 
 +  *  
 +✅ Tip: If you need multi-level BOMs, Cushion can handle it by creating a BOM for each component, and using them inside the top-level BOM.
    
-✅ 6. (Optional) Add Suppliers and Purchase Prices+✅ 5. (Optional) Add Suppliers and Purchase Prices 
 For each raw material: For each raw material:
-Go to Product > Suppliers +  * Go to Product > Suppliers 
-Add supplier reference, price, and conditions.+  Add supplier reference, price, and conditions.
    
-✅ 7. (Optional) Create Manufacturing Order+✅ 6. (Optional) Create Manufacturing Order 
 Once BOMs are in place, you can: Once BOMs are in place, you can:
-Go to Manufacturing > New Order +  * Go to Manufacturing > New Order 
-Select Madrid Sofa +  Select Madrid Sofa 
-It will calculate all subcomponents recursively +  It will calculate all subcomponents recursively 
-You can execute the production and deduct materials from stock+  You can execute the production and deduct materials from stock
    
 ✅ Summary ✅ Summary
 +
 You’ve now modeled: You’ve now modeled:
-Raw Materials → defined and stock-managed +  * Raw Materials → defined and stock-managed 
-Components → each has its own BOM +  Components → each has its own BOM 
-Finished Good → final BOM uses components +  Finished Good → final BOM uses components 
-Optional: Suppliers, stock, and purchasing details+  Optional: Suppliers, stock, and purchasing details
  
  
contact.1747561692.txt.gz · Last modified: by 125.166.99.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki