User Tools

Site Tools


contact

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
contact [2025/05/18 16:44] – created 125.166.99.1contact [2025/05/18 16:54] (current) – 125.166.99.1
Line 4: Line 4:
  
 These are the lowest-level components (foam, fabric, zippers, etc.) These are the lowest-level components (foam, fabric, zippers, etc.)
 +
 Go to Products/Services > New Product: Go to Products/Services > New Product:
 +
 Create entries like: Create entries like:
-• HR Foam 40D – Seat +  * HR Foam 40D – Seat 
-• Fabric – Outdoor Grade A +  * Fabric – Outdoor Grade A 
-• Polyester Thread +  * Polyester Thread 
-• Zipper YKK 60cm +  * Zipper YKK 60cm 
-• Velcro Tape +  * Velcro Tape 
-• Plastic Bag (Rain Cover) +  * Plastic Bag (Rain Cover) 
-• Loss (%) – you may represent loss in BOM quantities (see below).+  * Loss (%) – you may represent loss in BOM quantities (see below). 
 For each: For each:
-• Type: Product +  * Type: Product 
-• Nature: Purchasable +  * Nature: Purchasable 
-• Stock management: Enable +  * Stock management: Enable 
-• Unit: e.g., meters, pcs, kg, etc.+  * Unit: e.g., meters, pcs, kg, etc.
    
-✅ 3. Define Sub-Assemblies (Components)+✅ 2. Define Sub-Assemblies (Components) 
 These are assembled from raw materials: These are assembled from raw materials:
-• Mattress Cushion +  * Mattress Cushion 
-• Back Cushion +  * Back Cushion 
-• Pillow +  * Pillow 
-• Rain Cover+  * Rain Cover 
 Create each as a Product, nature = Manufacturable, and assign a BOM (see Step 5). Create each as a Product, nature = Manufacturable, and assign a BOM (see Step 5).
    
-✅ 4. Define the Finished Good+✅ 3. Define the Finished Good 
 Create: Create:
 • Madrid Sofa • Madrid Sofa
-o Type: Product +  * Type: Product 
-o Nature: Manufacturable +  * Nature: Manufacturable 
-o Stock: Managed +  * Stock: Managed 
-o Selling: Enabled (if you sell it directly) +  * Selling: Enabled (if you sell it directly) 
-o Unit: pcs+  * Unit: pcs
    
-✅ 5. Create BOMs+✅ 4. Create BOMs 
 Go to MRP > Bill of Materials Go to MRP > Bill of Materials
 +
 Click New bill of materials for each manufacturable item. Click New bill of materials for each manufacturable item.
 +
 📌 A. BOM for "Mattress Cushion" 📌 A. BOM for "Mattress Cushion"
-Component Quantity Note + 
-HR Foam 40D – Seat 2 pcs  +  * Component Quantity Note 
-Fabric – Outdoor 3 m  +  * HR Foam 40D – Seat 2 pcs  
-Polyester Thread 50 m  +  * Fabric – Outdoor 3 m  
-Zipper YKK 60cm 2 pcs  +  * Polyester Thread 50 m  
-Loss (built-in) Add 5–10% to quantities if needed manually +  * Zipper YKK 60cm 2 pcs  
 +  * Loss (built-in) Add 5–10% to quantities if needed manually  
 📌 B. BOM for "Back Cushion" 📌 B. BOM for "Back Cushion"
 +
 Same style – just list relevant raw materials. Same style – just list relevant raw materials.
 +
 📌 C. BOM for "Rain Cover" 📌 C. BOM for "Rain Cover"
-Component Quantity + 
-Plastic Bag 1 pcs +  * Component Quantity 
-Velcro Tape 2 m +  * Plastic Bag 1 pcs 
-Thread 10 m+  * Velcro Tape 2 m 
 +  * Thread 10 m 
 📌 D. BOM for "Madrid Sofa" 📌 D. BOM for "Madrid Sofa"
-Sub-assembly Quantity + 
-Mattress Cushion 1 +  * Sub-assembly Quantity 
-Back Cushion 1 +  * Mattress Cushion 1 
-Pillow 2 +  * Back Cushion 1 
-Rain Cover 1 +  * Pillow 2 
-✅ Tip: If you need multi-level BOMs, Dolibarr can handle it by creating a BOM for each component, and using them inside the top-level BOM.+  * Rain Cover 1 
 +  *  
 +✅ Tip: If you need multi-level BOMs, Cushion can handle it by creating a BOM for each component, and using them inside the top-level BOM.
    
-✅ 6. (Optional) Add Suppliers and Purchase Prices+✅ 5. (Optional) Add Suppliers and Purchase Prices 
 For each raw material: For each raw material:
-• Go to Product > Suppliers +  * Go to Product > Suppliers 
-• Add supplier reference, price, and conditions.+  * Add supplier reference, price, and conditions.
    
-✅ 7. (Optional) Create Manufacturing Order+✅ 6. (Optional) Create Manufacturing Order 
 Once BOMs are in place, you can: Once BOMs are in place, you can:
-• Go to Manufacturing > New Order +  * Go to Manufacturing > New Order 
-• Select Madrid Sofa +  * Select Madrid Sofa 
-• It will calculate all subcomponents recursively +  * It will calculate all subcomponents recursively 
-• You can execute the production and deduct materials from stock+  * You can execute the production and deduct materials from stock
    
 ✅ Summary ✅ Summary
 +
 You’ve now modeled: You’ve now modeled:
-• Raw Materials → defined and stock-managed +  * Raw Materials → defined and stock-managed 
-• Components → each has its own BOM +  * Components → each has its own BOM 
-• Finished Good → final BOM uses components +  * Finished Good → final BOM uses components 
-• Optional: Suppliers, stock, and purchasing details+  * Optional: Suppliers, stock, and purchasing details
  
  
contact.1747561465.txt.gz · Last modified: by 125.166.99.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki