product:case_bom_madrid_sofa
This is an old revision of the document!
Table of Contents
๐๏ธ Madrid Sofa: BOM Simulation & Setup
This guide simulates how to fully define and structure a Madrid Sofa in CushionsERP using raw materials, sub-assemblies, and final BOMs.
โ 1. Define Raw Materials
These are the lowest-level components (foam, fabric, zippers, etc.)
Go to: Products/Services โ New Product
Create entries like:
- HR Foam 40D โ Seat
- Fabric โ Outdoor Grade A
- Polyester Thread
- Zipper YKK 60cm
- Velcro Tape
- Plastic Bag (Rain Cover)
For each item:
- Type: Product
- Nature: Purchasable
- Stock management: Enabled
- Unit: (e.g., meters, pcs, kg)
๐งฎ *You may reflect loss directly in BOM quantities (e.g., add 5% extra to cover waste).*
โ 2. Define Sub-Assemblies (Components)
These are intermediate items assembled from raw materials:
- Mattress Cushion
- Back Cushion
- Pillow
- Rain Cover
For each:
- Type: Product
- Nature: Manufacturable
- Stock Management: Enabled
- Assign a BOM (see Step 4)
โ 3. Define the Finished Good
Create product: Madrid Sofa
- Type: Product
- Nature: Manufacturable
- Stock: Managed
- Selling: Enabled (if sold directly)
- Unit: pcs
โ 4. Create BOMs
Go to: MRP โ Bill of Materials Create a new BOM for each manufacturable item.
| ๐ BOM A: Mattress Cushion |
|---|
* HR Foam 40D โ Seat โ 2 pcs
- Fabric โ Outdoor โ 3 m
- Polyester Thread โ 50 m
- Zipper YKK 60cm โ 2 pcs
- *(Apply 5โ10% loss if needed manually)*
| ๐ BOM B: Back Cushion |
|---|
* HR Foam 40D โ Back โ 1 pcs
- Fabric โ Outdoor โ 2 m
- Polyester Thread โ 30 m
| ๐ BOM C: Rain Cover |
|---|
* Plastic Bag โ 1 pcs
- Velcro Tape โ 2 m
- Thread โ 10 m
| ๐ BOM D: Madrid Sofa (Final Assembly) |
|---|
* Mattress Cushion โ 1
- Back Cushion โ 1
- Pillow โ 2
- Rain Cover โ 1
๐ Cushions supports multi-level BOMs by referencing component BOMs in the final product's BOM.
โ 5. (Optional) Add Suppliers & Prices
For each raw material:
- Go to Product โ Suppliers
- Add:
- Supplier reference
- Purchase price
- Minimum quantity or delay (optional)
โ 6. (Optional) Create Manufacturing Order
Once BOMs are created:
- Go to Manufacturing โ New Order
- Select Madrid Sofa
- System calculates all components recursively
- Execute the MO to deduct materials and add finished stock
โ Summary: Structure Modeled
- ๐งฑ Raw Materials โ Stock-managed, purchased
- ๐งฉ Sub-Assemblies โ Each with its own BOM
- ๐๏ธ Finished Good โ Final BOM uses subcomponents
- ๐ฐ *Optional*: Supplier pricing, inventory links
โ Next: Product Lot Number Guidance
product/case_bom_madrid_sofa.1747571570.txt.gz ยท Last modified: by admin