User Tools

Site Tools


product:case_bom_madrid_sofa

This is an old revision of the document!


๐Ÿ›‹๏ธ Madrid Sofa: BOM Simulation & Setup

This guide simulates how to fully define and structure a Madrid Sofa in CushionsERP using raw materials, sub-assemblies, and final BOMs.


โœ… 1. Define Raw Materials

These are the lowest-level components (foam, fabric, zippers, etc.)

Go to: Products/Services โ†’ New Product

Create entries like:

  • HR Foam 40D โ€“ Seat
  • Fabric โ€“ Outdoor Grade A
  • Polyester Thread
  • Zipper YKK 60cm
  • Velcro Tape
  • Plastic Bag (Rain Cover)

For each item:

  • Type: Product
  • Nature: Purchasable
  • Stock management: Enabled
  • Unit: (e.g., meters, pcs, kg)
๐Ÿงฎ *You may reflect loss directly in BOM quantities (e.g., add 5% extra to cover waste).*

โœ… 2. Define Sub-Assemblies (Components)

These are intermediate items assembled from raw materials:

  • Mattress Cushion
  • Back Cushion
  • Pillow
  • Rain Cover

For each:

  • Type: Product
  • Nature: Manufacturable
  • Stock Management: Enabled
  • Assign a BOM (see Step 4)

โœ… 3. Define the Finished Good

Create product: Madrid Sofa

  • Type: Product
  • Nature: Manufacturable
  • Stock: Managed
  • Selling: Enabled (if sold directly)
  • Unit: pcs

โœ… 4. Create BOMs

Go to: MRP โ†’ Bill of Materials Create a new BOM for each manufacturable item.

๐Ÿ“Œ BOM A: Mattress Cushion

* HR Foam 40D โ€“ Seat โ†’ 2 pcs

  • Fabric โ€“ Outdoor โ†’ 3 m
  • Polyester Thread โ†’ 50 m
  • Zipper YKK 60cm โ†’ 2 pcs
  • *(Apply 5โ€“10% loss if needed manually)*
๐Ÿ“Œ BOM B: Back Cushion

* HR Foam 40D โ€“ Back โ†’ 1 pcs

  • Fabric โ€“ Outdoor โ†’ 2 m
  • Polyester Thread โ†’ 30 m
๐Ÿ“Œ BOM C: Rain Cover

* Plastic Bag โ†’ 1 pcs

  • Velcro Tape โ†’ 2 m
  • Thread โ†’ 10 m
๐Ÿ“Œ BOM D: Madrid Sofa (Final Assembly)

* Mattress Cushion โ†’ 1

  • Back Cushion โ†’ 1
  • Pillow โ†’ 2
  • Rain Cover โ†’ 1
๐Ÿ” Cushions supports multi-level BOMs by referencing component BOMs in the final product's BOM.

โœ… 5. (Optional) Add Suppliers & Prices

For each raw material:

  • Go to Product โ†’ Suppliers
  • Add:
    • Supplier reference
    • Purchase price
    • Minimum quantity or delay (optional)

โœ… 6. (Optional) Create Manufacturing Order

Once BOMs are created:

  • Go to Manufacturing โ†’ New Order
  • Select Madrid Sofa
  • System calculates all components recursively
  • Execute the MO to deduct materials and add finished stock

โœ… Summary: Structure Modeled

  • ๐Ÿงฑ Raw Materials โ†’ Stock-managed, purchased
  • ๐Ÿงฉ Sub-Assemblies โ†’ Each with its own BOM
  • ๐Ÿ›‹๏ธ Finished Good โ†’ Final BOM uses subcomponents
  • ๐Ÿ’ฐ *Optional*: Supplier pricing, inventory links

โ†’ Next: Product Lot Number Guidance

product/case_bom_madrid_sofa.1747571570.txt.gz ยท Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki