product:case_bom_madrid_sofa
Table of Contents
๐๏ธ Madrid Sofa: BOM Simulation & Setup
This guide simulates how to fully define and structure a Madrid Sofa in CushionsERP using raw materials, sub-assemblies, and final BOMs.
๐ ๏ธ 1. Define Raw Materials
These are the lowest-level components used in manufacturing (e.g., foam, fabric, zippers).
๐ Navigate to: Products/Services โ New Product
๐ Create entries like:
- ๐งฝ HR Foam 40D โ Seat
- ๐งต Fabric โ Outdoor Grade A
- ๐ชก Polyester Thread
- ๐ Zipper YKK 60cm
- ๐ Velcro Tape
- ๐๏ธ Plastic Bag (Rain Cover)
For each item, configure:
- ๐ท๏ธ Type: Product
- ๐ Nature: Purchasable
- ๐ฆ Stock management: Enabled
- ๐ Unit: e.g., meters, pcs, kg
๐งฎ *Tip: Reflect material loss directly in BOM quantities โ for example, add 5% extra to account for waste.*
โ 2. Define Sub-Assemblies (Components)
These are intermediate items assembled from raw materials:
- Mattress Cushion
- Back Cushion
- Pillow
- Rain Cover
For each:
- Type: Product
- Nature: Manufacturable
- Stock Management: Enabled
- Assign a BOM (see Step 4)
โ 3. Define the Finished Good
Create product: Madrid Sofa
- Type: Product
- Nature: Manufacturable
- Stock: Managed
- Selling: Enabled (if sold directly)
- Unit: pcs
โ 4. Create BOMs
Go to: MRP โ Bill of Materials Create a new BOM for each manufacturable item.
| ๐ BOM A: Mattress Cushion | Quantity |
|---|---|
| HR Foam 40D โ Seat | 2 pcs |
| Fabric โ Outdoor | 3 m |
| Polyester Thread | 50 m |
| Zipper YKK 60cm | 2 pcs |
| *Apply 5โ10% loss if needed manually* |
| ๐ BOM B: Back Cushion | Quantity |
|---|---|
| HR Foam 40D โ Back | 1 pcs |
| Fabric โ Outdoor | 2 m |
| Polyester Thread | 30 m |
| ๐ BOM C: Rain Cover | Quantity |
|---|---|
| Plastic Bag | 1 pcs |
| Velcro Tape | 2 m |
| Thread | 10 m |
| ๐ BOM D: Madrid Sofa (Final Assembly) | Quantity |
|---|---|
| Mattress Cushion | 1 |
| Back Cushion | 1 |
| Pillow | 2 |
| Rain Cover | 1 |
๐ CushionsERP supports multi-level BOMs by referencing component BOMs in the final product's BOM.
โ 5. (Optional) Add Suppliers & Prices
For each raw material:
- Go to Product โ Suppliers
- Add:
- Supplier reference
- Purchase price
- Minimum quantity or delay (optional)
โ 6. (Optional) Create Manufacturing Order
Once BOMs are created:
- Go to Manufacturing โ New Order
- Select Madrid Sofa
- System calculates all components recursively
- Execute the MO to deduct materials and add finished stock
โ Summary: Structure Modeled
- ๐งฑ Raw Materials โ Stock-managed, purchased
- ๐งฉ Sub-Assemblies โ Each with its own BOM
- ๐๏ธ Finished Good โ Final BOM uses subcomponents
- ๐ฐ *Optional*: Supplier pricing, inventory links
โ Next: Product Lot Number Guidance
product/case_bom_madrid_sofa.txt ยท Last modified: by admin