🛋️ Madrid Sofa: BOM Simulation & Setup

This guide simulates how to fully define and structure a Madrid Sofa in CushionsERP using raw materials, sub-assemblies, and final BOMs.


🛠️ 1. Define Raw Materials

These are the lowest-level components used in manufacturing (e.g., foam, fabric, zippers).

📍 Navigate to: Products/Services → New Product

🆕 Create entries like:

  • 🧽 HR Foam 40D – Seat
  • 🧵 Fabric – Outdoor Grade A
  • 🪡 Polyester Thread
  • 🔗 Zipper YKK 60cm
  • 📏 Velcro Tape
  • 🛍️ Plastic Bag (Rain Cover)

For each item, configure:

  • 🏷️ Type: Product
  • 🛒 Nature: Purchasable
  • 📦 Stock management: Enabled
  • 📐 Unit: e.g., meters, pcs, kg
🧮 *Tip: Reflect material loss directly in BOM quantities — for example, add 5% extra to account for waste.*

✅ 2. Define Sub-Assemblies (Components)

These are intermediate items assembled from raw materials:

  • Mattress Cushion
  • Back Cushion
  • Pillow
  • Rain Cover

For each:

  • Type: Product
  • Nature: Manufacturable
  • Stock Management: Enabled
  • Assign a BOM (see Step 4)

✅ 3. Define the Finished Good

Create product: Madrid Sofa

  • Type: Product
  • Nature: Manufacturable
  • Stock: Managed
  • Selling: Enabled (if sold directly)
  • Unit: pcs

✅ 4. Create BOMs

Go to: MRP → Bill of Materials Create a new BOM for each manufacturable item.

📌 BOM A: Mattress Cushion Quantity
HR Foam 40D – Seat 2 pcs
Fabric – Outdoor 3 m
Polyester Thread 50 m
Zipper YKK 60cm 2 pcs
*Apply 5–10% loss if needed manually*
📌 BOM B: Back Cushion Quantity
HR Foam 40D – Back 1 pcs
Fabric – Outdoor 2 m
Polyester Thread 30 m
📌 BOM C: Rain Cover Quantity
Plastic Bag 1 pcs
Velcro Tape 2 m
Thread 10 m
📌 BOM D: Madrid Sofa (Final Assembly) Quantity
Mattress Cushion 1
Back Cushion 1
Pillow 2
Rain Cover 1
🔁 CushionsERP supports multi-level BOMs by referencing component BOMs in the final product's BOM.

✅ 5. (Optional) Add Suppliers & Prices

For each raw material:

  • Go to Product → Suppliers
  • Add:
    • Supplier reference
    • Purchase price
    • Minimum quantity or delay (optional)

✅ 6. (Optional) Create Manufacturing Order

Once BOMs are created:

  • Go to Manufacturing → New Order
  • Select Madrid Sofa
  • System calculates all components recursively
  • Execute the MO to deduct materials and add finished stock

✅ Summary: Structure Modeled

  • 🧱 Raw Materials → Stock-managed, purchased
  • 🧩 Sub-Assemblies → Each with its own BOM
  • 🛋️ Finished Good → Final BOM uses subcomponents
  • 💰 *Optional*: Supplier pricing, inventory links

→ Next: Product Lot Number Guidance

product/case_bom_madrid_sofa.txt · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki