-🏗️ Step-by-Step: Example of `Madrid SofaSetup:+===== 🛋️ Madrid Sofa: BOM Simulation & Setup =====
  
-✅ 1Define Raw Materials+This guide simulates how to fully define and structure a **Madrid Sofa** in CushionsERP using raw materials, sub-assemblies, and final BOMs.
  
-These are the lowest-level components (foam, fabric, zippers, etc.)+----
  
-Go to Products/Services > New Product:+==== 🛠️ 1. Define Raw Materials ====
  
-Create entries like: +These are the **lowest-level components** used in manufacturing (e.g., foam, fabric, zippers).
-  HR Foam 40D – Seat +
-  Fabric – Outdoor Grade A +
-  Polyester Thread +
-  Zipper YKK 60cm +
-  * Velcro Tape +
-  * Plastic Bag (Rain Cover) +
-  * Loss (%) – you may represent loss in BOM quantities (see below).+
  
-For each: +📍 Navigate to: **Products/Services → New Product** 
-  * Type: Product + 
-  * Nature: Purchasable +🆕 Create entries like: 
-  * Stock management: Enable +  * 🧽 HR Foam 40D – Seat   
-  * Unit: e.g., meters, pcs, kg, etc+  * 🧵 Fabric – Outdoor Grade A   
-  +  * 🪡 Polyester Thread   
-✅ 2. Define Sub-Assemblies (Components)+  * 🔗 Zipper YKK 60cm   
 +  * 📏 Velcro Tape   
 +  * 🛍️ Plastic Bag (Rain Cover)   
 + 
 +For each item, configure
 +  * 🏷️ **Type**: Product   
 +  * 🛒 **Nature**: Purchasable   
 +  * 📦 **Stock management**Enabled   
 +  * 📐 **Unit**: e.g., meters, pcs, kg 
 + 
 +> 🧮 *Tip: Reflect material loss directly in BOM quantities — for exampleadd 5% extra to account for waste.
 + 
 +---- 
 + 
 +==== ✅ 2. Define Sub-Assemblies (Components) ==== 
 + 
 +These are intermediate items assembled from raw materials:
  
-These are assembled from raw materials: +  * Mattress Cushion   
-  * Mattress Cushion +  * Back Cushion   
-  * Back Cushion +  * Pillow  
-  * Pillow+
   * Rain Cover   * Rain Cover
  
-Create each as a Product, nature = Manufacturable, and assign a BOM (see Step 5). +For each:
-  +
-✅ 3. Define the Finished Good+
  
-Create: +  * **Type**: Product   
-• Madrid Sofa +  * **Nature**: Manufacturable   
-  * Type: Product +  * **Stock Management**: Enabled   
-  * Nature: Manufacturable +  * **Assign a BOM** (see Step 4)
-  * Stock: Managed +
-  Selling: Enabled (if you sell it directly) +
-  * Unit: pcs +
-  +
-✅ 4. Create BOMs+
  
-Go to MRP > Bill of Materials+----
  
-Click New bill of materials for each manufacturable item.+==== ✅ 3Define the Finished Good ====
  
-📌 A. BOM for "Mattress Cushion"+Create product: **Madrid Sofa**
  
-  * Component Quantity Note +  * **Type**: Product   
-  HR Foam 40D – Seat 2 pcs  +  * **Nature**: Manufacturable   
-  Fabric – Outdoor 3 m  +  * **Stock**: Managed   
-  * Polyester Thread 50 m  +  * **Selling**: Enabled (if sold directly)   
-  * Zipper YKK 60cm 2 pcs  +  * **Unit**: pcs
-  * Loss (built-in) Add 5–10% to quantities if needed manually +
  
-📌 B. BOM for "Back Cushion"+----
  
-Same style – just list relevant raw materials.+==== ✅ 4Create BOMs ====
  
-📌 C. BOM for "Rain Cover"+Go to: **MRP → Bill of Materials**   
 +Create a new BOM for each manufacturable item.
  
-  * Component Quantity +^ 📌 BOM A: Mattress Cushion ^ Quantity ^ 
-  * Plastic Bag 1 pcs +| HR Foam 40D – Seat        | 2 pcs | 
-  * Velcro Tape 2 +| Fabric – Outdoor          | 3   | 
-  * Thread 10 m+| Polyester Thread          | 50 m  
 +| Zipper YKK 60cm           | 2 pcs | 
 +*Apply 5–10% loss if needed manually* | |
  
-📌 D. BOM for "Madrid Sofa"+📌 BOM B: Back Cushion ^ Quantity ^ 
 +| HR Foam 40D – Back        | 1 pcs | 
 +| Fabric – Outdoor          | 2 m   | 
 +| Polyester Thread          | 30 m  |
  
-  * Sub-assembly Quantity +^ 📌 BOM C: Rain Cover ^ Quantity 
-  Mattress Cushion 1 +| Plastic Bag              | 1 pcs | 
-  Back Cushion 1 +| Velcro Tape             | 2 m   | 
-  Pillow 2 +| Thread                  | 10 m  
-  Rain Cover 1 + 
-   +^ 📌 BOM D: Madrid Sofa (Final Assembly) ^ Quantity ^ 
-✅ Tip: If you need multi-level BOMs, Cushion can handle it by creating a BOM for each component, and using them inside the top-level BOM. +Mattress Cushion         |     | 
-  +Back Cushion             |     | 
-✅ 5. (Optional) Add Suppliers and Purchase Prices+Pillow                      | 
 +Rain Cover                  | 
 + 
 +> 🔁 CushionsERP supports **multi-level BOMs** by referencing component BOMs in the final product'BOM. 
 + 
 +==== ✅ 5. (Optional) Add Suppliers Prices ====
  
 For each raw material: For each raw material:
-  * Go to Product > Suppliers 
-  * Add supplier reference, price, and conditions. 
-  
-✅ 6. (Optional) Create Manufacturing Order 
  
-Once BOMs are in place, you can+  * Go to **Product → Suppliers** 
-  * Go to Manufacturing New Order +  * Add: 
-  * Select Madrid Sofa +    * Supplier reference 
-  * It will calculate all subcomponents recursively +    * Purchase price 
-  * You can execute the production and deduct materials from stock +    * Minimum quantity or delay (optional) 
-  + 
-✅ Summary+---- 
 + 
 +==== ✅ 6. (Optional) Create Manufacturing Order ==== 
 + 
 +Once BOMs are created: 
 + 
 +  * Go to **Manufacturing → New Order** 
 +  * Select **Madrid Sofa** 
 +  * System calculates all components recursively 
 +  * Execute the MO to deduct materials and add finished stock 
 + 
 +---- 
 + 
 +==== ✅ Summary: Structure Modeled ==== 
 + 
 +  * 🧱 **Raw Materials** → Stock-managed, purchased   
 +  * 🧩 **Sub-Assemblies** → Each with its own BOM   
 +  * 🛋️ **Finished Good** → Final BOM uses subcomponents   
 +  * 💰 *Optional*: Supplier pricing, inventory links
  
-You’ve now modeled: +----
-  * Raw Materials → defined and stock-managed +
-  * Components → each has its own BOM +
-  * Finished Good → final BOM uses components +
-  * Optional: Suppliers, stock, and purchasing details+
  
 +→ Next: [[product:product_lot_number_guidance|Product Lot Number Guidance]]
  