-===== Bill of Materials (BOM) =====+===== 🏗️ Step-by-Step: Example of ''Madrid Sofa'' Setup in Cushions =====
  
-A BOM defines how a product is built from components and raw materials.+==== ✅ 1. Enable Necessary Modules ==== 
 +Go to **Home > Setup > Modules** and activate: 
 +  * Products/Services 
 +  * Manufacturing (MRP) 
 +  * Warehouse (Stock) 
 +  * Third Parties (Customers/Suppliers) 
 +  * Purchases & Sales (optional but recommended)
  
-**Example: Madrid Sofa (Finished Good)**+==== ✅ 2. Define Raw Materials ==== 
 +These are the lowest-level components (foam, fabric, zippers, etc.)
  
-  * Mattress Cushion (Component)+Go to **Products/Services > New Product** and create entries like: 
 +  * HR Foam 40D – Seat 
 +  * Fabric – Outdoor Grade A 
 +  * Polyester Thread 
 +  * Zipper YKK 60cm 
 +  * Velcro Tape 
 +  * Plastic Bag (Rain Cover) 
 +  * Loss (%) – represent loss in BOM quantities manually
  
-  * Back Cushion (Component)+**For each material:** 
 +  * Type: Product 
 +  * Nature: Purchasable 
 +  * Stock management: Enabled 
 +  * Unit: meters, pcs, kg, etc.
  
-  * Decorative Pillow (Component)+==== ✅ 3. Define Sub-Assemblies (Components) ==== 
 +These are assembled from raw materials: 
 +  * Mattress Cushion 
 +  * Back Cushion 
 +  * Pillow 
 +  * Rain Cover
  
-  * Raincover (Component)+Create each as a **Product**, nature = **Manufacturable**, and assign a BOM (see Step 5).
  
-**Back Cushion - BOM**+==== ✅ 4. Define the Finished Good ==== 
 +Create: 
 +  * **Madrid Sofa** 
 +    * Type: Product 
 +    * Nature: Manufacturable 
 +    * Stock: Managed 
 +    * Selling: Enabled (if you sell it directly) 
 +    * Unit: pcs
  
-  * PU Foam 30D – 1.2 kg+==== ✅ 5. Create BOMs ==== 
 +Go to **MRP > Bill of Materials**
  
-  * Polyester Fabric – 0.8 m+Click **New bill of materials** for each manufacturable item.
  
-  * Sewing Thread – 5 m+=== 📌 A. BOM for ''Mattress Cushion'' === 
 +^ Component ^ Quantity ^ Note ^ 
 +| HR Foam 40D – Seat | 2 pcs | | 
 +| Fabric – Outdoor | 3 m | | 
 +| Polyester Thread | 50 m | | 
 +| Zipper YKK 60cm | 2 pcs | | 
 +| *(Loss built-in)* | *Add 5–10% manually if needed* | |
  
-**Mattress Cushion - BOM**+=== 📌 B. BOM for ''Back Cushion'' === 
 +^ Component ^ Quantity ^ 
 +| HR Foam 30D – Back | 1.5 pcs | 
 +| Fabric – Outdoor | 2 m | 
 +| Polyester Thread | 25 m |
  
-  * PU Foam 30D – 3.5 kg+=== 📌 C. BOM for ''Rain Cover'' === 
 +^ Component ^ Quantity ^ 
 +| Plastic Bag | 1 pcs | 
 +| Velcro Tape | 2 m | 
 +| Polyester Thread | 10 m |
  
-  * Polyester Fabric – 2 m+=== 📌 D. BOM for ''Madrid Sofa'' === 
 +^ Sub-assembly ^ Quantity ^ 
 +| Mattress Cushion | 1 | 
 +| Back Cushion | 1 | 
 +| Pillow | 2 | 
 +| Rain Cover | 1 |
  
-  * Zipper – 1 pc+**✅ Tip:** Cushions supports multi-level BOMs by assigning BOMs to subcomponents and referencing them in the top-level BOM.
  
-**Decorative Pillow - BOM**+==== ✅ 6. (Optional) Add Suppliers and Purchase Prices ==== 
 +For each raw material: 
 +  * Go to Product > Suppliers 
 +  * Add supplier reference, price, and purchase conditions
  
-  * Hollow Silicon Fiber – 0.6 kg+==== ✅ 7. (Optional) Create Manufacturing Order ==== 
 +Once BOMs are in place: 
 +  * Go to **Manufacturing > New Order** 
 +  * Select **Madrid Sofa** 
 +  * All subcomponents will be calculated recursively 
 +  * Execute the production to deduct materials from stock
  
-  * Velvet Fabric – 0.7 m+==== ✅ Summary ==== 
 +You’ve now modeled: 
 +  * Raw Materials → defined and stock-managed 
 +  * Components → each has its own BOM 
 +  * Finished Good → final BOM uses components 
 +  * Optional: Suppliers, stock, and purchasing details
  
-**Raincover - BOM** 
- 
-  * Waterproof Tarpaulin – 2.5 m 
- 
-  * Velcro Strips – 3 pcs 
- 
-**Loss Percentage Handling** 
- 
-  * Add 5–10% to fabric or foam quantities if your production tends to waste material. 
- 
- 
-**Tips** 
- 
-  * Keep your BOMs clean and versioned. 
- 
-  * Make sure every raw material is properly stocked. 
cushions/bom.1747564437.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki